(Effingham, IL) — Work begins today at the I-57 Neoga interchange. The nearly 55-million-dollar project will consist of the southbound bridge being reconstructed in 2026 and the northbound bridge being reconstructed in 2027. A barrier wall will be constructed on the northbound bridge to separate the driving lane and passing lane.
Colin McIntyre/jpg Copyright © 2026 TTWN Media Networks Inc.


















Comments